关于英文合同范文汇总5篇
在不断进步的社会中,合同的法律效力与日俱增,签订合同也是避免争端的最好方式之一。那么问题来了,到底应如何拟定合同呢?下面是小编为大家收集的英文合同5篇,欢迎大家分享。
英文合同 篇1Contract No.: LYLS-01-20121228
日期:20xx-12-28
Date: 20xx-12-28
签约地点:
Place: ZIYANG, CHINA 合 同 Contract 合同号:
买方:
The buyers: Sichuan LianYou Textile Industry Corporation (LMT)
General Manager: Huang De
卖方:
The sellers: German Textile Machinery Company
Sales Manager: David Paul
本合同由买卖双方根据下列条款和条件,经买卖双方共同协商签订,以便共同遵守
This contract is made by and between the buyer and the seller: whereby the buyer and the seller agree to the under-mentioned goods subject to the terms and conditions as stipulated below:
1. 商品名称和规格
Name of Commodity and Specification
Name of Commodity :Flexible Rapier Loom抗扰箭杆织布机
Specifications: MIG,德国最新生产MIG型号
Quantity:50.00sets
Unit price: USD$150000.00/set CIF5% SHANGHAI, CHINA
Total value: USD$ 7500000.00
2. 原产国及制造厂商:
Country of origin & manufacturer: Germany
3. 装运期限:
Shipping date: NOT LATER THAN MAR 30, 20xx
4. 装运口岸:
Port of loading: Hamburger Germany
5. 到货口岸:
Port of destination: SHANGHAI, CHINA
6. 付款条件:
Terms of payment: 100% of the total value will be paid by L/C at 90 days at sight.
7. 包装:需用适合长途海运,防潮、防湿、防震、防锈、耐粗暴搬运的包装,由包装不良
所发生的损失,由于采用不充分或不妥善的防护措施而造成的任何锈损,卖方应负担由此产生的`一切费用和/或损失。
Packing: The packages should be suitable for long distance freight transportation and well protected against dampness, moisture, shock, rust and rough handling. The sellers shall be liable for any damage to the goods on account of improper packing and for any rust damage attributable to inadequate or improper protective measures taken by the sellers.
8. 装运条款:卖方保证按时将合同所述货物运往买方港口。
Terms of shipment: The seller shall ship the goods within the shipping date from the port of shipment to the
port of destination. Transshipment is not allowed without the buyer’s consent.
9. 装运通知:货物全部装船后,卖方将于10个工作日内将合同编号、商品名称、数量、毛重、发票金额、船名和开船日期传真通知买方。
Shipping advice: The seller shall within 10 working days after the completion of the loading of the goods advise by fax the buyers of the contract No., commodity, quantity, invoice value, gross weight, name of vessel and date of sailing.
10. 保险:
Insurance: Insurance shall be covered by the seller for 110% of the invoice value against Additional Risks and Strike Risks 11. 检验: Inspection 卖方须在装运前15日委托德国机械进出口检验机构对本合同之货物进行检验并出具检验证书,货到目的港后,由买方委托中国进出口货物检验机构进行检验。 The Seller shall have the goods inspected by 15 days before the shipment and have the Inspection Certificate issued by German Machinery I/E Inspection Bureau. The Buyer may have the goods reinspected by China I/E Inspection Corporation Shanghai Branch after the goods arrived at the destination.
12. 索赔:货物到达买方后,买方应向中国进出口商品检验检疫局申请对质量、规格、数量进行初步检验,并出具检验证明书,如发现货物品质、规格、数量与合同不符,除保险公司或船运公司应负责的以外,买方在货到90天内有权换货或索赔,一切费用(如商检费、相关的运费、保险费etc)由卖方承担。
Claims: Within 90 days after the arrival of goods at destination should be quality, specifications or quantity be found not in conformity with the stipulations of the contract except those claims for which the insurance company or the owners of the vessel are liable. the buyers shall, on the strength of the inspection certificate issued by Entry-Exit Inspection and Quarantine of the People’s Republic of China have the right to claim for replacement with new goods or for compensation and all the expenses (such as inspection charges, freight for returning the goods and for sending the replacement insurance premium) shall be borne by the sellers.
12. 仲裁:凡有关本合同或执行本合同而发生的一切争执,应通过友好协商解决。如不能解决,则应申请进行仲裁。仲裁将在中国贸易促进委员会仲裁委员会进行。其做出的裁决是最终的,买卖双方均应受其约束,任何一方不得向法院或其他机关申请变更。仲裁费用由败诉方负担。
Arbitration: All disputes in connection with this contract or the execution thereof shall be settled through friendly negotiation, in case no settlement can be reached through negotiations, the case under dispute shall be submitted for arbitration to the China Economic and Trade Arbitration Commission Beijing in accordance with the provisional rules of procedures promulgated by the said arbitration commission. The award of the arbitration shall be final and binding upon both parties for revising the decision. The arbitration fee shall be borne by the losing part.
13. 不可抗力:由于人力不可抗拒事故,而卖方交货迟延或不能交货时,责任不在卖方,但卖方应立即将事故通知买方,并于事故发生后十四天内将事故发生地政府主管机关出具的事故证明用空邮寄交卖方为证。
Force Majeure: The seller shall not be held responsible for any delay in delivery or non-delivery of the goods due to force majeure, which might occur during the process of manufacturing or in the course of loading or transit. However, the seller shall advise the buyer immediately of such occurrence and within 14 days thereafter, the seller shall send by airmail to the buyers for their acceptance a certificate of the accident issued by the competent government authorities of the place where the accident occurs as evidence thereof.
14. 附加条款:本合同一式二份买卖双方各执一份。
Supplements and other terms: This contract is made in two originals, one original to be held by each party. The original pieces have the same law effect to each party. All the disputes would be solved by the buyer within the people’s court of Sichuan province according to the Contract Law of PRC.
英文合同 篇2GARMENTS PURCHASE CONTRACT
Contract NO.合同编号:
Date签约日期:
Buyer: 买方:
Seller: 卖方:
This purchase contract (hereafter abbreviated “contract”) is signed by and between the Buyer and the Seller upon equal negotiations based on the Contract Law and other relevant laws and regulations. Both parties agree to sell and buy goods on following terms and conditions.
此销售合同(以下简称“合同”)根据合同法及相关法律法规并经由买卖双方经平等协商后共同签定,买方与卖方均同意以下条款和条件购买和出售货物。
Purchasing Contract terms and conditions of garments Season: 服装采购合同条款:
1. Description, quantity, unit price, total amount and other details of the goods ordered please refer to detail order, invoice and packing list. The name of the issuing company of invoice must be the same as the seller.
采购品名、规格、数量、单价、总价、交期等参考每次采购相应订单、发票及装运单,发票的填开单位必须与本合同中卖方的名称相一致。
2. Country of origin: China原产地:中国
3. Delivery: The seller shall deliver the goods to the warehouse as previously agreed between the two parties.
交货方式:卖方应把货物送交至双方事先约定的仓库。
4. The quality of all the garments shall answer for the updated, valid Standard of the Nation and the industry. In case the garments are unqualified or for other reason that shall ascribe the seller’s fault, which brings losses of or damages (including but
not limited to fine, expropriate, damage to Goodwill, lawyer’s fee and other losses for the buyer ’s breach of law or contract because of the seller fault) to the buyer, the buyer shall has the right to ask seller for damages.
所有服装质量应符合最新、有效的国家标准、行业标准的规定,若卖方交付的服装质量不合格或其他任何可归咎于卖方的责任导致买方遭受的任何损失(包括但不限于罚没款、扣款、商誉损失、律师费及其他因卖方原因导致买方违约、违法所遭受的损失),买方有权要求卖方承担。
5. Seller shall provide 7 original copies of "Approved" Quality Inspection Certificate for each fabric used to produce MOTIVI different models 7 days before the delivery date. The certificate must be issued by a Chinese official quality testing department, the samples that the seller send to quality test lab shall be representative, can represent the quality of the goods, and the test must follow the Basic Standard GB18401 and include the composition of the fabric. The buyer will settle the payment according to the contract after received the test report and other related documentations (Packing list, Invoice of Goods etc.).
卖方应于交货日七日前向买方提供由中国官方质检部门认可的质检机构出具的所有用来制作服装的面料的合格质检报告原件7 份,卖方向质检机构送检的样品应具有代表性,能够代表大货质量,质检报告应包含纤维含量及国家标准 GB18401 的安全技术要求事项。买方在收到质检报告、装箱单、货物发票等其他文件后按合同约定付款。
6. For all the goods, the seller shall issue invoice to the buyer, the invoice shall be invoiced 所有货物应由卖方向买方开具发票,发票抬头需开列买方单位名称为
Kind of invoice issued: People’s Republic of China VAT invoice
发票开立种类:中华人民共和国增值税专用发票。
7. Terms of Payment: Total amount of payment of goods shall be paid in RMB within 30 days issued the invoices.
付款: 开立发票后30日内以人民币支付。
Upon signing the contract, the seller shall provide bank information for the buyer to effect payment.
买卖双方签定订购合同后,卖方需提供公司银行资料给予买方支付货款.。
8. Intellectual Property Right 知识产权
All the goods, documents and materials that the Seller gets to may concerns secret and shall procure that its employee, agent and any other persons who may have access to the above-mentioned information keep confidentiality and shall not use it for any purpose at any time or disclose to any third party. The seller shall not sell, transfer any products or materials to any third party except for the buyer products, substandard products, rest products and unused/waste products or materials. In case the seller breaches, the buyer has the right to ask for
indemnification including but not limited investigation fees, lawyer’s fees,
compensation as well as all other fees according to the stipulations or Chinese laws. 卖方接触到的'买方及集团的物品、文件资料均可能涉及买方及其关联公司的知识产权,尤其是可能包含的买方商标、集团的其他商标,著作权及商业秘密。卖方应对其知悉的买方及其关联公司的商业秘密进行保密,并应促使卖方所有接触到买方秘密信息的任何雇员、代理人、客户或其他人士对该信息保密,不得在任何时候为任何目的使用或者向任何第三人披露。卖方不得向除买方及集团以外的任何单位和个人销售、转让涉及买方及米罗利奥集团的商标、标识标记、著作权等知识产权的产品或资料,即使对于过季品、等外品、富余品和废弃不用的产品或资料也不例外。若卖方违反约定,买方有权根据约定及中国法律规定要求卖方承担包括但不限于调查费、律师费、赔偿金在内的一切赔偿责任。
9. Both parties will try to resolve any dispute concerning the contract amicably. If the dispute can not be resolved by negotiation, any party may initial legal action.
买卖双方在履行本合同时如有争议应先以友好协商方式解决,如协商不成买卖双方可将争议送交由提出诉讼方所在地之法院进行诉讼.
10. All appendixes to this contract should be bonded to the contract as a whole.
英文合同 篇3This Agreement is made in Haidian District, _________(Placename)on _________,_________,_________(M,D,Y) among the following parties:
AAA (Passport No.: _________);
BBB (ID No.: _________);
CCC (ID No.: _________);
DDD (ID No.: _________);
EEE (ID No.: _________);
FFF (ID No.: _________); and HHH Co., Ltd., with official address being: _________(Address)hereinafter "HHH").
Whereas:
A. III entered into a three-year term loan agreement with HHH on _________,_________,_________(M,D,Y). Pursuant to the said loan Agreement, III has borrowed RMB_________ from HHH to invest in the establishment of JJJ Co., Ltd.
(hereinafter "JJJ Company").
B. BBB entered into a three-year term loan agreement with HHH on _________,_________,_________(M,D,Y). Pursuant to the said loan agreement, BBB has borrowed RMB_________ from HHH to invest in the establishment of the JJJ Company.
C. The JJJ Company was 70% owned by III and 30% owned by BBB right after its establishment.
D. III entered into the share transfer agreement on _________,_________,_________(M,D,Y) with each of AAA, CCC, DDD, EEE and FFF.
Pursuant to the said share transfer agreements, III has transferred 30% of the shares of the JJJ Company to AAA and 10% of the shares of the JJJ Company to each of CCC, DDD, EEE and FFF.
E. A debt transfer and assumption agreement was entered into on _________,_________,_________(M,D,Y) among III, AAA, CCC, DDD, EEE, FFF and HHH. Pursuant to the said debt transfer and assumption agreement, III has transferred his repayment obligation under the aforementioned loan agreement with HHH to AAA, CCC, DDD, EEE, and FFF; AAA has assumed RMB_________ loan obligation from III and each of CCC, DDD, EEE and FFF has assumed RMB_________loan obligation from III.
F. As of the date of this Agreement, each of AAA and BBB owns 30% of the shares of the JJJ Company and each of CCC, DDD, EEE and FFF owns 10% of the shares of the JJJ Company. To maintain their interest in the JJJ Company, each of AAA and BBB owes HHH RMB_________ and each of CCC, DDD, EEE and FFF owes HHH RMB_________.
Therefore, the parties agree to the following regarding the repayment of loan from each of AAA, BBB, CCC, DDD, EEE and FFF to HHH:
1. Repayment of Loan
1.1 HHH has the right to request each of AAA, BBB, CCC, DDD, EEE and FFF (each hereinafter "the borrowing p
英文合同 篇4The buyer: the seller: ____________ ____________
Address: Address: ____________ ____________
Tel: ____________ Tel: ____________
Fax: Fax: ____________ ____________
Contact: Contact: ____________ ____________
The sale of the friendly negotiation of both parties, the buyer seller commissioned processing production ________ mould Co ______ set. The two sides reached the following processing agreement
Basic mould of die:
Product name serial number part name point number (mold type) mold single price (RMB yuan) delivery condition
Total price: (including 17% VAT)
The above set of mould material: _____________________
(the above mold materials are provided by the seller).
I. The rights and responsibilities of the two parties:
Buyer's responsibility and rights are as follows:
1. the buyer is responsible for the delivery of the R & D requirements and plans of the seller's project, and provides the sales forecast as far as possible.
2. the buyer is responsible for the delivery of the product design drawings and other related technical information required by the seller to the seller and the technical support.
3., the buyer has the sole right to interpret the product design drawings and related technical data delivered to the seller. When there is ambiguity, the Seller shall consult the buyer's opinion and confirm it by the buyer.
4. after the seller completes the design and manufacture of the mould, the buyer will go to the seller's site to verify the mold, or to provide the product sample to the buyer for confirmation and confirmation by the seller. The moulds referred to in this contract include the mould of the product itself and the fixture and mould needed for the subsequent production.
The rights and responsibilities of the seller are as follows:
1. the seller is responsible for the design and manufacture of the moulds according to the product design drawings and other related technical information provided by the buyer.
Be responsible for completing the mold according to the buyer's design requirements in accordance with the stipulations of the contract.
2. the Seller shall be responsible for providing timely certification and sample test, trial production of desired products. At the same time the seller must provide the details of the related products.
The detailed test report is for the buyer's confirmation. In case of repair / modification, the test report is also attached at the same time.
The buyer does not bear any responsibility.
1.5 the Seller shall give the buyer the corresponding compensation in the form of the buyer's approval as the seller causes the buyer to spend the labor and cost outside the normal technical support as a result of the seller's cause.
2. the progress of the model:
2.1 the seller after the receipt of the buyer after the confirmation of product drawing, which began to enter the mold design and production stage, open cycle for ________ days
2.2 due to buyer's cause the delay of mold making progress is not calculated.
2.3 if the seller's mold making process and other mistakes lead to the failure of the mold to be accepted and the buyer is in urgent need of production.
At the same time, the production should be arranged with the existing mold, and the die should be reopened according to the requirements of the drawings and samples.
3. mode of payment:
Party B agrees that Party A will pay the payment as follows.
3.1 separate settlement: Monthly knot, 60 days after the opening of the ticket, open 17% VAT invoices.
3.1.1 of the total amount of the contract manufacturing batch mould (including VAT) for RMB _________ yuan (RMB ________ yuan), the buyer to pay the total amount of _____% mold, mold ___% residual cost allocation in the first 50K products, if the number of orders less than 50K, the buyer shall supply the seller after the unamortized tooling cost.
3.1.2 from the two sides after the signing of the contract, the seller to provide value-added tax invoices (mold total ____%), the buyer within twenty working days of payment.
4. product order: only after the quality acceptance of the product sample is qualified and the buyer's written confirmation, the seller may accept the order of the third party authorized by the buyer or the buyer. The order contract signed by third parties authorized by the buyer with the buyer's seller is subject to this contract.
Four, product quality assurance
After the seller has completed the mold, the Seller agrees to guarantee the quality of the product in accordance with the buyer's quality standard (the first confirmation report).
The buyer reserves the right to modify the content of the quality standard in accordance with the actual needs.
Five. The ownership of the mold
1. the ownership of all moulds and clamping fixtures and their assembly drawings and parts drawings (including 2D and 3D) involved in the contract shall be owned by the buyer, and the Seller shall not interfere with the buyer's disposition of the molds. If the seller is responsible for the custody of the seller, the Seller shall not supply the mould to the third party without the buyer's consent, otherwise the buyer shall have the right to ask the seller to return the mold fee and compensate for the loss.
2. when the buyer pays the mold cost, the seller must cooperate with the buyer or the third party designated by the buyer to transfer the inspection and accept the replacement of the die from the seller's place, and will replace the worn parts at the expense of itself, so as to ensure the restart of production. The seller is obliged to assemble, rust and pack the moulds and send it to the place designated by the buyer. All mold assembly drawings and part drawings (including 2D and 3D) and all clamping devices must be transferred to the buyer at the same time.
3., during the process of mold transfer, such as the improper assembly, rust prevention or packaging of the seller, it will cause damage to the mold, and all direct and indirect losses arising therefrom shall be borne by the seller.
Six, mold maintenance
1., the Seller guarantees the service life of the mould 500 thousand times, and the seller is responsible for free maintenance during this period. If the mold is not used during the service life, the Seller shall be responsible for changing or re opening the mold and taking the corresponding cost.
2. the seller should die changes, maintenance and repairs in a timely manner and register, whether such a modification, maintenance and repair are
The buyer made it. If the buyer is to ask the relevant technical details or evidence, the buyer may register with the time without notice. The Seller shall give the buyer a copy of the record once every three months. The seller should take the initiative to complete this task on a regular basis without the buyer's request.
Six. Intellectual property rights
The product and the buyer 1. involved in this contract to provide design drawings and other information in the intellectual property is owned by the buyer, the buyer without permission, the Seller shall not disclose to any company or individual, otherwise all the losses resulting from the seller; the buyer only agreed to all data and information provided by the seller by the buyer the purpose of this contract based on the,
2. the Seller agrees to the design drawings will not be provided by the buyer and other data or information for the purpose of non contract other than the seller or the buyer has the right to pursue responsibility; without written permission from the buyer, the Seller shall not in publications, advertising or other written and oral form to the seller to provide or have provided any data and information.
3., without the buyer's license, it is strictly prohibited for the seller to use this mould to supply other customers other than the buyer or the buyer's designated customer, otherwise all direct and indirect losses arising from it shall be the seller's responsibility.
4. other undisclosed matters of confidentiality are carried out in accordance with the "confidentiality agreement" signed by the buyer and the seller.
Seven. Liability for breach of contract
1. the Seller shall be liable for breach of contract if the seller fails to complete the mold making and sample delivery according to the progress of each stage specified in the 2.1. The Seller shall pay the buyer a fine of 2% of the total amount of this contract at a time of one day of delay. The amount of the penalty is not more than the total amount of the contract.
2., if the seller's cause causes the seller's quality to be supplied to the buyer can't meet the buyer's requirements, and the other materials will be lost and scrapped during the assembly process, the seller will fully compensate for the loss and scrap materials and the resulting artificial / stop line costs. The two part(桃花仙人是谁?唐寅,《桃花庵歌》是诗人唐寅创作的一首七言古诗。诗中诗人以桃花仙人自喻,以“老死花酒间”与“鞠躬车马前”分别代指两种截然不同的生活方式,又以富贵与贫贱的各有所失,形成鲜明强烈的对比,表现了自己平凡真实中带有庸俗消极一面的真实内心,带有愤世嫉俗之意气。)ies may sign separately the raw material for production.
3. the quality and progress of the product provided to the buyer by the seller for the seller's cause can not reach the buyer.
Place)
3. when the mold is certified by the buyer, the seller is responsible for the seal of the mold. If the buyer agrees that the seller is responsible for the subsequent processing and production of the products, the Seller shall be responsible for the repair and maintenance of the moulds, and the Seller shall make the batch production according to the order of the third party authorized by the buyer or the buyer.
4. for all the molds produced by the buyer, the Seller shall provide the buyer with detailed design drawings. All drawings must be made in AutoCAD or pro-eng (pro-el2) and must be transmitted to the buyer in electronic form before the mold opening for approval.
Two. Technical terms:
1. repair and maintenance of the mold: the seller is responsible for the repair and maintenance of the mold during the production process.
2., after no dispute between the two sides, the buyer will provide the product design drawings and related technical information to the seller, and send the engineer to the seller's technical exchange or the seller send the engineer to the buyer for technical communication. The product drawings and technical requirements list is attached to Annex 1.
3. the seller promised to use the quality requirements of the mold for the system to produce products to the buyer
4. the seller promised to use the mold for the system to produce the product can reach the seller's delivery capacity:
Nissan energy: _______k, monthly capacity: ______k
5. the seller promises that all the moulds involved in this contract can be reached to 400 thousand times.
6., without the buyer's permission, it is strictly prohibited for the seller to contract the whole part of the contract involved in the contract to other companies for processing. Otherwise, the Seller shall be liable for breach of contract in accordance with the breach clause of the contract as a breach of contract.
Three. The terms of business:
1. mold price:
1.1 after negotiation between the two parties, the seller will provide the final offer of the mould approved by the buyer and sign the price confirmation as an indispensable part of the contract.
The total amount of 1.2 contract (including VAT mold ____%) rmb_______.
1.3 the total cost of the price of the mold contains the following expenses, and the Seller shall not ask the buyer for the following reasons:
1.3.1 the cost of all the fixtures and tools required by the seller for the molding / two processing / assembly of the product;
1.3.2 the seller, according to the contract, carries out the cost of material, equipment and manpower for mould design, test mould.
1.3.3 the cost of the sample (800 sets) provided by the seller to the buyer for the certification of the mold and product;
1.3.4 the seller is the cost of the die vulnerable spare parts to ensure the normal production of the mold;
1.3.5 the cost of the related tools and tools for other processes that are prepared for the normal production of the product.
1.4 when the written request of the buyer the seller according to the change of the product design for the mould modification, if the mould modification is relatively simple, including less mold material changes and other simple changes from the mold, the seller to the buyer without charges; if the modification is complex, great influence on the whole structure of the mold, then the seller according to the modified working hours for mold to the buyer by the buyer offer, the corresponding mold modification cost. The buyer shall not bear any responsibility for the repair or modification of the mold due to the seller's reason, due to the failure of the mold to meet the buyer's requirements.
1.5 by the seller to the buyer's manual and cost technical support from the normal cost, the Seller shall give the buyer recognized the way the corresponding compensation.
2. the progress of the model:
2.1 after the seller has received the product drawing file after the buyer's confirmation, that is,
The cost of artificial / stop line formation. The two parties may sign separately the raw material for production.
3. if the seller has caused the seller to the buyer of the product quality and schedule is not up to the requirements of the buyer, the buyer and customer missed the best time to market, or the buyer was forced to cancel the project, so that the buyer and its customers suffer serious losses and loss of material research, in addition to the seller to refund all previous the buyer to pay the purchase price, depending on the actual situation of the seller also bear the buyer direct and indirect economic losses.
4., if the seller is unable to resist force, including the war, fire, strike, and other force majeure caused by Chinese law, the buyer will allow the buyer to dismiss it. The Seller shall notify the buyer in written form within 24 hours after the occurrence of the force majeure, and the seller is obliged to take all necessary measures to deliver the goods as soon as possible. If the force majeure continues for more than 2 weeks, the buyer has the right to cancel this contract.
5. other unfinished matters: implemented in accordance with the economic contract law.
Eight. Dispute settlement
Any dispute arising from the execution of this contract shall be settled through friendly negotiation first. If no negotiation can be reached within 30 days, either party can submit the dispute to the municipal court.
The parties to this contract shall be strictly enforced. If one party fails to perform the contract in the cause of the contract, the party must ask for the consent of the other party two weeks in advance, and the contract shall be terminated.
The buyer: the seller: ____________ ____________
Representative: Representative: ___________ ____________
英文合同 篇5TENANCY AGREEMENT
出租方:
Landlord:
身份证号:
ID number:
地址:
Address:
银行账号:
Bank No:
承租方:
Tenant:
身份证号:
ID number:
出租方 (以下简称甲方)与承租方(以下简称乙方)于年 月日,双方一致就以下各项条款达成协议。(本合同以中文为准)
An agreement made on the date of between the landlord(hereinafter referred to as Party A) and the tenant as Party B) is hereby mutually agreed by and between the said parties to be as
follows:
一、 租赁标的:
Tenancy:
甲方同意将 室 及其家具电器设备在良好状态下
租给乙方,租用分户面积总计约 平方米。家具与电器设备清单见
附件。
Party A hereby agrees to and the furniture and
electrical appliances therein in clean and tenantable condition to Party B, the size of
the leased property being Please see appendix for the list of furniture
and electrical appliances.
二、 租期:
Term of Tenancy:
2.1 租赁期为年,自年月日起至年月日止。
The above property is hereby leased for a term of year, commencing on
and expiring on 2.2 租赁届满,甲方有权收回全部出租房屋及家俱、电器,乙方应如期交还
(正常损耗及房屋结构上的潜在缺陷除外;返还的租赁房屋应当符合租赁房屋性质使用后的状态),乙方如要求续租,在同等条件下享有优先续租权,须在本租约期满前一个月向甲方提出书面申请,租金和租期双方另行协商。
On expiry of this lease, Party A has the right to take back the leased property with furniture and electrical appliances in full, and Party B must deliver the leased property on the date of expiry (fair wear and tear, structural and inherent defeats excepted). After the leasing term, the apartment has to maintain the reasonable condition. If Party B wishes to extend the lease, Party B shall have the priority to renew the lease with the same condition and is required to give written notice to Party A One month prior the expiry of this lease , the revised rental rate and period should be negotiated between the two parties
三、租金:
Rent:
3.1 ,取暖,家具,电器(另见附件1)(家
具及电器预算人民币 元整).
The rent month, including furniture, electrical appliances,management fee,heating fee.
3.2 租金支付方式为年付(十二个月)一次性支付,共计人民币 for one year rental。
3.3 租金以人民币支付。乙方在收到甲方的付款通知后须尽快付款,甲方
收到租金后付给乙方全额收据。
The rent is payable in rmb. Party B has to pay the rent as soon as possible after receiving the note of payment from Party A. Party A then should issue a reciept of the total payment to Party B.
3.4 在本租约有效期内,租金不予调整。
The rental cannot be adjusted during the term of this Tenancy Agreement.
四、 押金:
Deposit:
4.1 本租约签订之日,乙方应向甲方缴付壹个月租金额的租赁押金计人民币
。租约期满,乙方如不再续租,甲方应在租赁期结束后十日内(在乙方将租赁期间发生的全部水,电,煤气等杂费付清后),将押金退还(不计利息)
The day after the signature of this Tenancy Agreement, Party B must pay to Party A one months rental as deposit, totaling On completion of the tenancy period. if Party B does not continue to rent the leased property, Party A must return the deposit in full to Party B (excluding interest) within ten days after the termination or early of the Lease Agreement under the condition that Party B has paid all the utilities fee such as water, electricity, gas and telephone.
4.2 乙方如违反租约规定,致使甲方未能如期收取租金或因而发生费用开 支,甲方可以根据凭证扣留全部或部分押金抵付。不足部分甲方有权要 求乙方赔偿。
If Party B breaks any part of this contract, such as not paying the rent punctually, or causing additional expenses to Party A, Party A has the right to retain part of or all of
the deposit as compensation according to its actual losses. If the said deposit is insufficient to cover Party A’s costs, Party A has the right to ask for compensation if any.
4.3 发生4.2条款情况,押金不足抵付时,乙方必须按接到甲方付款通知后 十日内补足。
If Clause 4.2 is brought into effect, and the said deposit is insufficient to cover Party A’s costs, Party B should pay the extra amount to Party A within ten days of receipt of Party A’s invoice notice.
4.4 押金以人民币支付。甲方收到押金后付给乙方全额收据。
The deposit is payable in RMB. Party A should issue a receipt to Party B after receiving the deposit.
五、 其它费用:
Other Charges:
5.1 乙方在租赁期内所用的水、电、煤气,***等费用由乙方缴付。 Party B’s utilities expenses during the lease term will be paid by Party B.
六、 甲方的责任:
Landlord’s Responsibilities:
6.1 租赁期内甲方不得无故收回房屋,如甲方中途要求收回房屋,乙方可以
拒绝。
Party A is not permitted to take back the leased property during the term of the contract without any reason. If Party A wishes to do so, Party B has the right to object.
6.2 负责对乙方正常使用中发生的房内家具、电器及其他设施损坏或故障进
行及时维修并承担费用。
To undertake responsibility and assume such costs for timely repairs to furniture, electrical appliances and other facilities that are damaged or have malfunctioned through normal usage by Party B.
6.3 督促物业公司提供充分的保安、消防工作及安静清洁的居住环境。 To supervise the estate management office to provide adequate security, fire prevention and quirt & circumstance.
6.4 督促管理公司向乙方提供所应提供的服务,如冷水、热水、电的供应及
各种设备(包括空调)的正常工作,并提供公共区域和公共设施的`开放,如健身房、儿童房和其他娱乐场所。督促公共区域和公共设施的清洁;公共区域的照明并提供道路指示牌。督促道路和公共区域的维护;督促修理、保养和更换大厦的保安设施、消防设施、电器设施、变压器、煤气、排水、空调、电梯和其它设施。
To ensure the estate manager to provide proper service to Party B, such as supply of cold water, hot water, electricity, proper maintenance of all kinds of equipment (including air-conditioners), and to provide free access to public areas and facilities such as gymnasium, children’s room and other recreational areas. To clean public areas and facilities; to illuminate public areas and provide signs; to repair access ways and public areas; to repair, maintain, and replace security, fire fighting and electrical appliances, transformer, gas, sewage, air conditioning systems, elevators, lifts and other facilities of the building.
6.5 保证物业的合法性,保证有合法权利出租该物业。
Ensure the legality of the leased property. Ensure its legal rights to lease the property.
6.6 负责因违反上述责任而对乙方造成的所有损失的赔偿。
To compensate Party B for all loss arising from any breach of the above-mentioned responsibilities.
6.7负责开通***及宽带,负责乙方入住前清洁室内卫生.
七、 乙方责任:
Tenant’s Responsibilities:
7.1 乙方应按本租约三、四、五条款规定交付租金,押金和各项费用,如有
拖欠,则作违约论。
Party B should promptly pay the rent, deposit and other charges as set out in Clauses 3,4 and 5of the Agreement. Non-payment of these charges constitutes a breach of this Agreement.
7.2 租赁期内未经甲方同意,乙方不能转租其所租房屋,私自转让无效。 During the period of Tenancy, unless with the agreement of Party A, Party B cannot sub-let or let in part or in full the leased property to other Party.
7.3 乙方应爱护房屋及其设备,如因使用不当导致损坏应负责赔偿。
Party B must take care of the property and its contents, otherwise Party B should pay compensation to Party A for his improper use of the property.
7.4 在房内已有的装饰和设施之外,乙方如要增加设备或其他装修须征得甲
方同意;租赁期满必须恢复原状如有损坏(正常使用磨损、结构或原有的问题除外),并承担其费用,经甲方验收认可后归还甲方。
In addition to the decoration and equipment already in the property, if Party B wishes to make any alterations or decorate the property, Party B should get the permission from Party A. On completion of the tenancy, Party B must hand-over the property to Party A in its original condition ( fair wear and tear, structural and inherent defects expected), and all fees arising from such work have to be borne by Party B.
7.5 保证赔偿由于乙方或乙方有关系的官员、上司、雇员、客人、来访者、
雇佣工人、代理、执照持有者或被邀请人等(统称与乙方相关的人)的粗心及疏忽造成的房屋的损害或损失,并允许甲方或其代理人在事先通知后进入房屋,对房屋的损失或损害进行弥补及修复,在此所发生的费用由乙方负担。
To indemnify Party A for any loss or damage to the leased property from negligent act or omission of Party B or any officer, director, employee, guest, visitor, servant, agent licensee or in invitee of Party B (each referred to hereinafter individually as an “associate” ), to permit Party A or his authorized representatives, with an advance notice, to enter the leased property to repair any such loss or damage at the expense of Party B.
7.6 在甲方预先通知后,乙方应允许甲方或其代理人在有理由的情况下在合
理的时间进入及巡视房屋进行必要的维修或修复工作;在租赁期最后一个月内,允许甲方或其代理人带领有意租赁或购买房屋的客人视察房屋,但乙方已按第2.2条书面通知甲方将续租时除外。
With Party A’s notice in advance, Party B should permit Party A and the person authorized by Party A under reasonable circumstances to enter and view the leased property at reasonable hours, to carry out any work and repairs which is necessary to be done. During the last one months of the Tenancy, Party A has the right to show the
leased property to prospective lessors or purchasers, unless according to clause 2.2, Party B has informed Party A of its intention to renew the Lease.
7.7 在未经甲方书面同意下,乙方不得擅自设立、安装或移动设施及设备,
不能擅自设立隔段,不得擅自对房屋的结构机关改动或增加。
Not to erect, install or remove any fixtures or partitioning, or to make any structural additions and alterations without the prior written consent of Party A.
7.8 租赁房屋过程中,必须严格遵守中华人民共和国的有关法律、细则、规
章及法令的规定,并严格禁止乙方利用房屋进行违犯法律及不道德的行为。
Strictly to comply and adhere in the use of the leased property with all laws, regulations and decrees of the People’s Republic of China applicable to such use, and specifically not to permit or suffer the leased property to be used for any purpose that is unlawful or immoral.
7.9 房屋除供乙方居住之外,未经甲方书面同意,房屋不可作办公或协议未
曾说明之用。上述同意不应不合理地拒绝。
To use the leased property exclusively as the residence of his family and not to use the leased property as an office or for any other purpose without the prior written consent or Party A , which consent shall not be ueasonably withheld.
7.10 未经甲方书面同意,屋外不得擅自放置标示板及陈列任何设施,不允许
在房外、窗及门上挂晒衣物以影响房屋外观面貌,该条件不得被不合理拒绝。
Not to affix or display any signboard or other device visible from outside the leased property without the prior written consent of Party A, which consent shall not be ueasonably withheld, and not to use the outside of the leased property or any doors or windows to hang any washing.
7.11 租客必须遵守物业条例准则,如出现纠纷需与业主来协商调解。
To obey the regulation is set by the management office, in case any dispute arises, the two parties shall negotiate friendly.
八、 房屋不能居住时其他事件:
Other things:
房屋由于***,恶劣天气,战争或其它甲方不可抗拒因素,而不是
因为乙方直接或间接的疏忽及故意行为造成房屋毁坏而不能被正常使用及居住时,乙方从该日起停止支付租金,直至房屋可再被使用及居住时为止,如该房屋因任何不能归因于乙方的原因不能正常使用超过10天,乙方有权终止合同并无需承担任何责任,甲方应退还剩余部分押金及预付租金。甲方根据自己的意愿及经济、实际意义等原因,没有义务必须修缮复原房屋。若此情况发生,甲方应书面通知乙方,并在作出上述通知的十天之内将押金及预付租金全部退还乙方。
If the leased property are substantially destroyed or damaged by fire, bad weather, war, force major, or other causes beyond the control of Party A and not attributable directly or indirectly to the negligence or malice of Party B or are otherwise rendered unfit for use or occupation, the rent shall cease to be payable from the date the leased property become unfit for use or occupation until the leased property shall again be rendered accessible and fit for use, if the lessor’s property can not be properly used for any reasons beyond 10 days, Party B has the right to terminate the agreement without any
【英文合同】相关文章:
英文合同05-16
英文合同[荐]07-01
借款合同英文12-11
英文购销合同06-19
英文合同(实用)07-07
精选英文合同四篇02-03
精选英文合同三篇12-25
英文合同必备词汇03-19
购销合同英文范本04-01
英文购销合同模板12-14